H
HansPM
Hi,
Being a total lamen to VBA, I'm trying to use the build-in 'code generator'
without any succes at all to make a date format which looks like: "06
wk38.1", which represent the date of today 18 sept 2006. I need to use this
format for start and finish dates. There is a standard format in project
that looks like it but adds the time as well, and that is info I do not need.
Thanks!
Hans
Being a total lamen to VBA, I'm trying to use the build-in 'code generator'
without any succes at all to make a date format which looks like: "06
wk38.1", which represent the date of today 18 sept 2006. I need to use this
format for start and finish dates. There is a standard format in project
that looks like it but adds the time as well, and that is info I do not need.
Thanks!
Hans