I have created an Assignment view and need the dates on the right-hand side
of the grid to display the month and day (i.e., MM/DD, M/DD, or something
like that). I also only need the grid to display with a two week range. Is
that possible?
It looks like it will display the month (i.e., 4/7, 4/8, 4/9, etc.) whenever
a range of greater than two weeks is displayed , but not less than two weeks
(i.e., Thursday 7, Friday 8, Saturday 9, etc.).
We are using Managed Periods, if that makes a difference.
Thanks for your help,
Brian
of the grid to display the month and day (i.e., MM/DD, M/DD, or something
like that). I also only need the grid to display with a two week range. Is
that possible?
It looks like it will display the month (i.e., 4/7, 4/8, 4/9, etc.) whenever
a range of greater than two weeks is displayed , but not less than two weeks
(i.e., Thursday 7, Friday 8, Saturday 9, etc.).
We are using Managed Periods, if that makes a difference.