I have two columns and in each column I have a date and time.
A1 has 7/22/09 13:31
B1 has 7/29/09 14:53
I need to know the average length of time it took to get from A1 to B1 (if
it's possible) Basically A1 is when something was submitted and B1 is when
someone actually worked on it. Need to know the average time it took to get
it worked on.
Thanks.
A1 has 7/22/09 13:31
B1 has 7/29/09 14:53
I need to know the average length of time it took to get from A1 to B1 (if
it's possible) Basically A1 is when something was submitted and B1 is when
someone actually worked on it. Need to know the average time it took to get
it worked on.