Chrissmith99
I have just discovered the datepicker function and want to utilize it t
it maximum potential on a form.
I want to be able to pick a to and from date I can work out some of th
fields but others are more difficult.
I know how to generate a day from a date from the datepicker using past
link like this
Date: 14 July 2013 Updates another field called Day:
SUNDAY
BUT I want to then add a second date based on this start date. I wan
my second date to update so that I can not enter a datepicker box to pu
in this date and not allow the user to input a before this start date.
SECOND DATE
Date: 15 July 2013 Updates another field called Day:
MONDA
it maximum potential on a form.
I want to be able to pick a to and from date I can work out some of th
fields but others are more difficult.
I know how to generate a day from a date from the datepicker using past
link like this
Date: 14 July 2013 Updates another field called Day:
SUNDAY
BUT I want to then add a second date based on this start date. I wan
my second date to update so that I can not enter a datepicker box to pu
in this date and not allow the user to input a before this start date.
SECOND DATE
Date: 15 July 2013 Updates another field called Day:
MONDA