D
DOUG ECKERT
Is there a way to plot dates in a scatter diagram or something similar? (The
alternative I have used is to show the number of days between the dates a
supposedly critical report was run and to graph that instead). I envision
something which would show a timeline of some kind on a graph with the actual
dates displayed.
DOUG
alternative I have used is to show the number of days between the dates a
supposedly critical report was run and to graph that instead). I envision
something which would show a timeline of some kind on a graph with the actual
dates displayed.
DOUG