J
Jean-Francois
Hi all,
I have a table table with the following entries:
ID Date
1 01-Aug-03
2 05-Aug-03
3 18-Aug-03
What would be the best way to calculate the "working"
days between any two dates? If I wanted to calculate an
average time spent, what would be the best function?
Thank you very much,
Jean-Francois
I have a table table with the following entries:
ID Date
1 01-Aug-03
2 05-Aug-03
3 18-Aug-03
What would be the best way to calculate the "working"
days between any two dates? If I wanted to calculate an
average time spent, what would be the best function?
Thank you very much,
Jean-Francois