J
JGreg7
Once again, the automatic switch to daylight saving time caused my one-day
events to now span two days. This seems to happen somewhat randomly, not
with all the one-day events. I seem to recall a patch that was supposed to
fix this, but apparently it no longer works.
I have way to many events to individually change each one, that and I do not
know if the span went ahead or behind (e.g. for an event now covering the 9th
and 10th, I do not know if the original date was the 9th or the 10th).
How do I fix this?
Windows XP sp2, Outlook 2003 sp3
events to now span two days. This seems to happen somewhat randomly, not
with all the one-day events. I seem to recall a patch that was supposed to
fix this, but apparently it no longer works.
I have way to many events to individually change each one, that and I do not
know if the span went ahead or behind (e.g. for an event now covering the 9th
and 10th, I do not know if the original date was the 9th or the 10th).
How do I fix this?
Windows XP sp2, Outlook 2003 sp3