jzylla
I am trying to calculate the costs incurred, over a period of time but,
having them spread in the month they will be generated.
Example: $5000 worth of costs will be incurred from 3/15/09-4/10/09. I can
calculate the cost per day, based on the range but, I'm not sure how to have
it show only the costs occurred in March.
ultimately, I would like to have a rolling report, where I can output this
info over a 12 month period from the current month, and indicate the actual
costs per month.
Thanks.
having them spread in the month they will be generated.
Example: $5000 worth of costs will be incurred from 3/15/09-4/10/09. I can
calculate the cost per day, based on the range but, I'm not sure how to have
it show only the costs occurred in March.
ultimately, I would like to have a rolling report, where I can output this
info over a 12 month period from the current month, and indicate the actual
costs per month.
Thanks.