B
babryanton
(I posted this in WS Fxns on July 7 & didn't get any response, so I'
hoping to have better luck in this forum, as I really need an answer
Thank you!!)
I am creating a problem report spreadsheet for work. In col C I have
date/time that the problem started, eg, 23-Jun-2006 15:20 and in col
I have a date/time for when the problem was resolved, eg, 26-Jun-200
15:40.
I need to calculate the amount of hours that we were not available fo
use (due to the problem). This is based on a list of available hours
Eg, on Mondays we are available 19.5 hrs, T-F 22.5 hrs, Sa 14.5 hrs
and Sun 0 hrs.
If I do a straight subtraction, it uses 24 hrs for each day - no
taking into account our available hrs. If I do NETWORKDAYS i
automatically doesn't consider Sat or Sun - and i need it to - and i
does have a DayEnd and DayStart but it assumes they are constants.
I found the day corresponding to the date and thought I could determin
the series of days between it, e.g., if the start day was Friday & th
end day Monday, the series in between is Sat & Sun. Then I could do
lookup on all 4 days in a table & add them all together. But I can'
figure out how to do this!
Can anyone please PLEASE help!?
Thanks so much
hoping to have better luck in this forum, as I really need an answer
Thank you!!)
I am creating a problem report spreadsheet for work. In col C I have
date/time that the problem started, eg, 23-Jun-2006 15:20 and in col
I have a date/time for when the problem was resolved, eg, 26-Jun-200
15:40.
I need to calculate the amount of hours that we were not available fo
use (due to the problem). This is based on a list of available hours
Eg, on Mondays we are available 19.5 hrs, T-F 22.5 hrs, Sa 14.5 hrs
and Sun 0 hrs.
If I do a straight subtraction, it uses 24 hrs for each day - no
taking into account our available hrs. If I do NETWORKDAYS i
automatically doesn't consider Sat or Sun - and i need it to - and i
does have a DayEnd and DayStart but it assumes they are constants.
I found the day corresponding to the date and thought I could determin
the series of days between it, e.g., if the start day was Friday & th
end day Monday, the series in between is Sat & Sun. Then I could do
lookup on all 4 days in a table & add them all together. But I can'
figure out how to do this!
Can anyone please PLEASE help!?
Thanks so much