M
Marco
Hi all,
The records from my Baseline1 and Baseline2 fields disappeared. The
cost, work, duration, start and finish records for tasks related to
these baselines totally disappeared. Althought the same records for
the project summary task are still registered. The Baseline1 field was
saved in oct/06 and the Baseline2 fields was saved in nov/06. Can
somebody help me, please???
Thanks a lot!
Marco.
The records from my Baseline1 and Baseline2 fields disappeared. The
cost, work, duration, start and finish records for tasks related to
these baselines totally disappeared. Althought the same records for
the project summary task are still registered. The Baseline1 field was
saved in oct/06 and the Baseline2 fields was saved in nov/06. Can
somebody help me, please???
Thanks a lot!
Marco.