N
namrepus4
Hi, I am trying to create visio file by importing *.csv files into visio
2000. I have had limited success, but I want to connect the shapes--from the
stencil sheets--together. Does anyone have any documentation about this? From
the basic flowchart stencil sheet, i can link together two process shapes
with a connection. But I do not know how to connect an annotation shape to a
process shape. I also do not know how to put two words on different lines for
an annotation shape. I know it's confusing, but I have an example of what I
am trying to do. The following is a *.csv text file. Put this into a file
with extension *.csv, Open it up in visio 2000 under *.csv, and you will see
what VISIO tries to do. I want to conenct the Annotation shape to the process
shapes:
Template, "Basic Flowchart.vst"
Shape,"1","Process","Start",,,,,,,
Shape,"2","Process","Some kind of input",,,,,,,
Shape,"3","Process","Test the input",,,,,,,
Shape,"4","Process","Display true message",,,,,,,
Shape,"6","Process","Now that's really cool",,,,,,,
Shape, "7", "Process", "Cool",,,,,,,
Shape,"8","Process","Yippeeee",,,1,4,,,
Shape, "9", "Annotation", "Sched ID 031",,,,,,,
Shape,"10",Audit,Cruddy,4.25,5.5,,,,5,2.5
Link,,"Next",,"1","2"
Link,,"Next",,"2","3"
Link,,"Next",,"6","7"
Link,,"Next",,"8","6"
Link,,"Also",,"9","6"
2000. I have had limited success, but I want to connect the shapes--from the
stencil sheets--together. Does anyone have any documentation about this? From
the basic flowchart stencil sheet, i can link together two process shapes
with a connection. But I do not know how to connect an annotation shape to a
process shape. I also do not know how to put two words on different lines for
an annotation shape. I know it's confusing, but I have an example of what I
am trying to do. The following is a *.csv text file. Put this into a file
with extension *.csv, Open it up in visio 2000 under *.csv, and you will see
what VISIO tries to do. I want to conenct the Annotation shape to the process
shapes:
Template, "Basic Flowchart.vst"
Shape,"1","Process","Start",,,,,,,
Shape,"2","Process","Some kind of input",,,,,,,
Shape,"3","Process","Test the input",,,,,,,
Shape,"4","Process","Display true message",,,,,,,
Shape,"6","Process","Now that's really cool",,,,,,,
Shape, "7", "Process", "Cool",,,,,,,
Shape,"8","Process","Yippeeee",,,1,4,,,
Shape, "9", "Annotation", "Sched ID 031",,,,,,,
Shape,"10",Audit,Cruddy,4.25,5.5,,,,5,2.5
Link,,"Next",,"1","2"
Link,,"Next",,"2","3"
Link,,"Next",,"6","7"
Link,,"Next",,"8","6"
Link,,"Also",,"9","6"