A
Anne
I have created a web page that lets people listen to a sound clip and rate
what they hear...the score and time during the clip are written to a Dbase.
I want to be able to report the average scores and time during clip by using
a PPT presentation. I want to have a line graph of the scores write
dynamically in a graph as the same sound clips plays. In other words, I want
the score to post at the exact time during the clip that it was scored as the
clip is playing. Is this possible???
what they hear...the score and time during the clip are written to a Dbase.
I want to be able to report the average scores and time during clip by using
a PPT presentation. I want to have a line graph of the scores write
dynamically in a graph as the same sound clips plays. In other words, I want
the score to post at the exact time during the clip that it was scored as the
clip is playing. Is this possible???