K
Klaus Schuerkamp
I want to make a timeline that is dynamic. I work with events that are planned for the future, but does not follow a 24hr/day rate of time (usage may be 18hrs/ day but may vary), and I would like it to update automatically. I'm using an hour meter to measure the rate of usage in a time period and I would like to be able to enter hour meter readings and have the timeline update with an entry of a new hour meter reading. Is there such a beast out there or does one have to be developed and how would I go about doing that?