Hi,
The last week I posted a post about this point but the point is still opened.
So I continu to investigate and put update. (thanks Julie).
Context:
Be sure the data (earn value) are correct before to propose to project
manager.
Issue:
I find several informations on office online and other place.
To clarify the fields:
"Travail réel" is equal to actual work.
"Coût rée" is equal to actual cost.
"Coût" is equal to cost.
"Travail planifié" is equal to baseline work.
So I analyse line after line for the first column, but the value obtains for
EV is incorrect.
What is your point of view?
You can find the entire document below.
http://docs.google.com/Doc?id=dgq4sw2r_2072t6k76z34
best regards,
Alexandre BARAULT
The last week I posted a post about this point but the point is still opened.
So I continu to investigate and put update. (thanks Julie).
Context:
Be sure the data (earn value) are correct before to propose to project
manager.
Issue:
I find several informations on office online and other place.
To clarify the fields:
"Travail réel" is equal to actual work.
"Coût rée" is equal to actual cost.
"Coût" is equal to cost.
"Travail planifié" is equal to baseline work.
So I analyse line after line for the first column, but the value obtains for
EV is incorrect.
What is your point of view?
You can find the entire document below.
http://docs.google.com/Doc?id=dgq4sw2r_2072t6k76z34
best regards,
Alexandre BARAULT