Brian
The labor rates for a portion of the resources in the project have changed.
I want to update the earned value fields (BCWS, BCWP, etc.) without saving a
new baseline. I want to save the history of the work performed vs. the
baselined work and only change the cost data.
Is there a method to update only the EV cost fields without rebaselining the
project?
Thanks