M
Mullie21
I have a PPT report that includes approximately 200 charts originated from a
single Excel workbook. I've incorporated the charts with links so the PPT
file automatically updates as the Excel file changes. The problem I have is
that I need to change the source (Excel) file from time to time. Is there a
way in PPT 2003 to change the source file for all links at the same time? Or
do I have to change the links 200 times?
My understanding is that there is no way to change the source for all of the
links simultaneously in PPT 2003. Is this true? Is this problem solved in
PowerPoint 2007?
Thanks,
Chris
single Excel workbook. I've incorporated the charts with links so the PPT
file automatically updates as the Excel file changes. The problem I have is
that I need to change the source (Excel) file from time to time. Is there a
way in PPT 2003 to change the source file for all links at the same time? Or
do I have to change the links 200 times?
My understanding is that there is no way to change the source for all of the
links simultaneously in PPT 2003. Is this true? Is this problem solved in
PowerPoint 2007?
Thanks,
Chris