I downloaded the Resource Critical Path macro referenced in the book "Dynamic
Scheduling with MS Project 2007". I am able to see the macro but the Run
button is grayed out. When I double click the macro I get a message that
macros have been disabled. I set macro security to low but it did not change
anything.
How do I get this macro to run?
Thanks,