O
oracman
I am aware that project server allows customization of enterprise task
outline code 1 thru 30, is it possible to create enterprise summary outline
task codes which need to exist in all project files (mandatory fields) so we
can look for project consistency throughout the organization?(the number of
subtasks shud be flexible)
i do not care much about the sub tasks under each of these summary task to
be in the project contents.
help will be appreciated.
thanks
outline code 1 thru 30, is it possible to create enterprise summary outline
task codes which need to exist in all project files (mandatory fields) so we
can look for project consistency throughout the organization?(the number of
subtasks shud be flexible)
i do not care much about the sub tasks under each of these summary task to
be in the project contents.
help will be appreciated.
thanks