EPM 2003: Custom Project Field Lost value...

V

Vit

Hi all,

I have noticed a very strange problem: a custom REQUIRED project field
has "lost" the values...

what can be happened?? none can erase the value (because it is
required!!!!), but now in many project (not all) the field is
empty....

Thanks to all

Cheers

Vit
 
P

ProjmanZA

Hi all,

I have noticed a very strange problem: a custom REQUIRED project field
has "lost" the values...

what can be happened?? none can erase the value (because it is
required!!!!), but now in many project (not all) the field is
empty....

Thanks to all

Cheers

Vit

That me dear friend is fixed with the infrastructure update !!
 
V

Vit

That me dear friend is fixed with the infrastructure update !!

Thanks for the quick reply....

what kind of "infrastructure update"????

service pack??? hotfix???

thanks

Vit
 
P

ProjmanZA

Thanks for the quick reply....

what kind of "infrastructure update"????

service pack??? hotfix???

thanks

Vit- Hide quoted text -

- Show quoted text -

Hey ,

Its called the Infrastructure Updates, One for Moss , One for Mops ,
One for MSP
 
V

Vit

thanks guys, but I'm talking of the 2003 version...

is there an infrastructure update also fer the 2003 EPM????

thanks

Cheers

Vit
 
V

Vit

Hi Chak,

I have some custom fields at the project level, and I don't know why,
they are loosing their value (they are becoming empty)....

the strange thing is that the custom field are required......

I hope this can be usefull to suggest me something.....

Thank you so much

Vit
 
P

ProjmanZA

Hi Chak,

I have some custom fields at the project level, and I don't know why,
they are loosing their value (they are becoming empty)....

the strange thing is that the custom field are required......

I hope this can be usefull to suggest me something.....

Thank you so much

Vit





- Show quoted text -

Whoops , did not see the version ... You have MSP sp3 Installed Vit ?
 
G

Gary L. Chefetz [MVP]

Vit:

Any chance you changed the value list for the fields displaying this
behavior? Changing the value list can and will delete values in the custom
fields for each project if the value is no longer valid.

--

Gary L. Chefetz, MVP
MSProjectExperts
For Project Server Consulting: http://www.msprojectexperts.com
For Project Server FAQS: http://www.projectserverexperts.com



Hi Chak,

I have some custom fields at the project level, and I don't know why,
they are loosing their value (they are becoming empty)....

the strange thing is that the custom field are required......

I hope this can be usefull to suggest me something.....

Thank you so much

Vit
 
V

Vit

no changes..... :(

I don't know if it is linked toany automatic update....

any other suggestion????

thanks

Cheers

Vit
 