I
Idvr
Hi,
I need to get an assignment data (work,actual work, overtime work...) on a
per day basiss. Is there a way to get it using the PSI or I need to create my
own extension to it?
thanks
I need to get an assignment data (work,actual work, overtime work...) on a
per day basiss. Is there a way to get it using the PSI or I need to create my
own extension to it?
thanks