R
RED
I am trying to calculate the days between two dates. I have used both
equations =a1-b1 and =days360(a1,b2) and both have worked in the first cell.
I need to copy this equation to over 400 more lines. When I copy the
equation it gives the right equation in each cell, however the value is the
same value as the first cell.. Help please!
equations =a1-b1 and =days360(a1,b2) and both have worked in the first cell.
I need to copy this equation to over 400 more lines. When I copy the
equation it gives the right equation in each cell, however the value is the
same value as the first cell.. Help please!