J
Jaishree
Hi All,
I get the following error while building the cube.It says Failed to connect
to the Analysis Services server.A connection cannot be made. Ensure that the
server is running.
The queue status shows that the job is 50% complete and the job has failed
but not blocking correlation.
How should i resolve??
===== Initiating cube build process =====
[12/11/2007 17:00] Cube build request message has been added to the Project
Server queue
===== Verifying and running pre-build server event handler =====
[12/11/2007 17:00] Verifying and running pre-build server event handler
===== Determining database and cube structure =====
[12/11/2007 17:00] Cube build initialization started
[12/11/2007 17:00] OLAP database and cube structure was determined
successfully
===== Building database and cubes =====
[12/11/2007 17:00] Cube build session started
[12/11/2007 17:00] Analysis Services session started
[12/11/2007 17:01] Analysis Services session failed with the following
error: Failed to connect to the Analysis Services server PRJSRV. Error: A
connection cannot be made. Ensure that the server is running.
===== Process Completed =====
[12/11/2007 17:01] Failed to build the OLAP cubes. Error: Analysis Services
session failed with the following error: Failed to connect to the Analysis
Services server PRJSRV. Error: A connection cannot be made. Ensure that the
server is running.
I get the following error while building the cube.It says Failed to connect
to the Analysis Services server.A connection cannot be made. Ensure that the
server is running.
The queue status shows that the job is 50% complete and the job has failed
but not blocking correlation.
How should i resolve??
===== Initiating cube build process =====
[12/11/2007 17:00] Cube build request message has been added to the Project
Server queue
===== Verifying and running pre-build server event handler =====
[12/11/2007 17:00] Verifying and running pre-build server event handler
===== Determining database and cube structure =====
[12/11/2007 17:00] Cube build initialization started
[12/11/2007 17:00] OLAP database and cube structure was determined
successfully
===== Building database and cubes =====
[12/11/2007 17:00] Cube build session started
[12/11/2007 17:00] Analysis Services session started
[12/11/2007 17:01] Analysis Services session failed with the following
error: Failed to connect to the Analysis Services server PRJSRV. Error: A
connection cannot be made. Ensure that the server is running.
===== Process Completed =====
[12/11/2007 17:01] Failed to build the OLAP cubes. Error: Analysis Services
session failed with the following error: Failed to connect to the Analysis
Services server PRJSRV. Error: A connection cannot be made. Ensure that the
server is running.