H
Hernandezz
Hi, i have this errors in event view, you know why?
Source: office sharepoint service
Category: Project Server Queue
Standard InformationSI Entry Point:
Project User: SAFIRA\epm
Correlation Id: f4cf8239-5499-4c20-9630-4c740c2df7e9
PWA Site URL: http://utamaro/PWA
SSP Name: SharedServices
PSError: GeneralQueueJobFailed (26000)
A queue job has failed. This is a general error logged by the Project Server
Queue everytime a job fails - for effective troubleshooting use this error
message with other more specific error messages (if any), the Operations
guide (which documents more details about queued jobs) and the trace log
(which could provide more detailed context). More information about the
failed job follows. GUID of the failed job:
06cee48e-ff2a-4764-b255-ce542ba5e87a. Name of the computer that processed
this job: UTAMARO (to debug further, you need to look at the trace log from
this computer). Failed job type: SynchronizeSingleUserMembershipInWss. Failed
sub-job type: SynchronizeSingleUserMembershipInWssMessage. Failed sub-job ID:
1. Stage where sub-job failed: (this is useful when one sub-job has more
than one logical processing stages).
For more information, see Help and Support Center at
http://go.microsoft.com/fwlink/events.asp.
Source: office sharepoint service
Project Server Analysis Cube Building
Standard InformationSI Entry Point:
Project User: UTAMARO\PMO
Correlation Id: 24eb804d-86ad-47df-9cc4-b457861516fe
PWA Site URL: http://utamaro/PWA
SSP Name: SharedServices
PSError: CBSASConnectionFailure (17003)
Cube build failed to connect to the Analysis Services server. Verify the
data source connection is valid. Error: Setting
UID=00007829-4392-48b3-b533-5a5a4797e3c9 ASServerName=UTAMARO
ASDBName=EPM2007_OLAP_DATA ASExtraNetAddress= RangeChoice=0 PastNum=1
PastUnit=0 NextNum=1 NextUnit=0 FromDate=09/21/2007 16:27:29
ToDate=09/21/2007 16:27:29 HighPriority=True
For more information, see Help and Support Center at
http://go.microsoft.com/fwlink/events.asp.
I hope any help.
thanks
Source: office sharepoint service
Category: Project Server Queue
Standard InformationSI Entry Point:
Project User: SAFIRA\epm
Correlation Id: f4cf8239-5499-4c20-9630-4c740c2df7e9
PWA Site URL: http://utamaro/PWA
SSP Name: SharedServices
PSError: GeneralQueueJobFailed (26000)
A queue job has failed. This is a general error logged by the Project Server
Queue everytime a job fails - for effective troubleshooting use this error
message with other more specific error messages (if any), the Operations
guide (which documents more details about queued jobs) and the trace log
(which could provide more detailed context). More information about the
failed job follows. GUID of the failed job:
06cee48e-ff2a-4764-b255-ce542ba5e87a. Name of the computer that processed
this job: UTAMARO (to debug further, you need to look at the trace log from
this computer). Failed job type: SynchronizeSingleUserMembershipInWss. Failed
sub-job type: SynchronizeSingleUserMembershipInWssMessage. Failed sub-job ID:
1. Stage where sub-job failed: (this is useful when one sub-job has more
than one logical processing stages).
For more information, see Help and Support Center at
http://go.microsoft.com/fwlink/events.asp.
Source: office sharepoint service
Project Server Analysis Cube Building
Standard InformationSI Entry Point:
Project User: UTAMARO\PMO
Correlation Id: 24eb804d-86ad-47df-9cc4-b457861516fe
PWA Site URL: http://utamaro/PWA
SSP Name: SharedServices
PSError: CBSASConnectionFailure (17003)
Cube build failed to connect to the Analysis Services server. Verify the
data source connection is valid. Error: Setting
UID=00007829-4392-48b3-b533-5a5a4797e3c9 ASServerName=UTAMARO
ASDBName=EPM2007_OLAP_DATA ASExtraNetAddress= RangeChoice=0 PastNum=1
PastUnit=0 NextNum=1 NextUnit=0 FromDate=09/21/2007 16:27:29
ToDate=09/21/2007 16:27:29 HighPriority=True
For more information, see Help and Support Center at
http://go.microsoft.com/fwlink/events.asp.
I hope any help.
thanks