I am using Excel 2003 and within a new spread sheet that I am creating I have
2 cells with dates in them. 1 cell is the date that the equipment was
inspected and the other cell is the date that the equipment needs re
inspection.
When this spread sheet is completed I would like to only change the date in
the inspection date cell and if available there be a formula to automatically
change the retest date.
2 cells with dates in them. 1 cell is the date that the equipment was
inspected and the other cell is the date that the equipment needs re
inspection.
When this spread sheet is completed I would like to only change the date in
the inspection date cell and if available there be a formula to automatically
change the retest date.