This is for a quarterly project report. Some execs are not using Project,
but Excel, so need to build a template for them to create their summaries.
They have a vision of a 3-months timescale at top, on the horizontal scale,
with high level deliverables along the vertical scale. The chart would have
details regarding work on the project (expressed as tasks).
X Axis: Deliverables 1, 2, 3, n
Y Axis:
A. Timescale, in months. (At top of chart)
B. Milestones Completed, Tasks (Floating in chart, in line with their
corresponding deliverable)
Started but not Finished, and Unstarted Tasks show along the Y Axis as
different colored bubbles or boxes surrounding the milestones and tasks.
There are three types of tasks that have to be represented – completed,
underway, and next steps. Each should have a different color.
I’ve had trouble getting the charts used so far to order the tasks in the
original, chronological order. Excel wants to take them and reorder them
based on the numeric data. I could use some help with that. Also, I think I
can do the chart as described by customizing a scatter diagram – can someone
confirm this or suggest something else?
Thanks!
Bev Powell
(e-mail address removed)
but Excel, so need to build a template for them to create their summaries.
They have a vision of a 3-months timescale at top, on the horizontal scale,
with high level deliverables along the vertical scale. The chart would have
details regarding work on the project (expressed as tasks).
X Axis: Deliverables 1, 2, 3, n
Y Axis:
A. Timescale, in months. (At top of chart)
B. Milestones Completed, Tasks (Floating in chart, in line with their
corresponding deliverable)
Started but not Finished, and Unstarted Tasks show along the Y Axis as
different colored bubbles or boxes surrounding the milestones and tasks.
There are three types of tasks that have to be represented – completed,
underway, and next steps. Each should have a different color.
I’ve had trouble getting the charts used so far to order the tasks in the
original, chronological order. Excel wants to take them and reorder them
based on the numeric data. I could use some help with that. Also, I think I
can do the chart as described by customizing a scatter diagram – can someone
confirm this or suggest something else?