Formaula Validation on COst /Schedule requested
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
Reply to thread
Message
[QUOTE="mike, post: 5000484"] I changed the formulat to the following: Task Number Formula: [Actual Cost]/[Baseline Cost] and dropped the clock everthing else on the .79 belwo green ..8to .99 yellow 100 green 100.01 red [/QUOTE]