S
Stoney Currie
Hi,
I need a formula that tells me when I have exceeded the optimum amount of
production in a 24 hour period and 16.5 hour period along with an 8.5 period.
We work in batches and a batch could take up to 20 minutes. We can have up
to 5 to 10 different batches in one of the above periods, each different
batch could take a different amount of time. I do have this times on another
tab called Batch Times.
Product A could take 20 mins. and product B could take 42 mins. If I plan
to produce 15 batches of product A that should take 300 minutes or 5 hours. I
now plan to produce product B at 42 mins a batch. I want 6 batches. This
should take 252 mins. or 4.2 hours. This exceeds 510 minutes or 8.5 hours and
this is where I want to be flagged with the word FULL. If I didn't have
enough production set up I would want to be flagged with word PRODUCE. Is
this possible?
Example A
A1 A2
# of Batches
Product # 15
Product # 20
FULL
Example B
A1 A2
# of Batches
Product # A 10
Product # B 5
PRODUCE
Thanks
I need a formula that tells me when I have exceeded the optimum amount of
production in a 24 hour period and 16.5 hour period along with an 8.5 period.
We work in batches and a batch could take up to 20 minutes. We can have up
to 5 to 10 different batches in one of the above periods, each different
batch could take a different amount of time. I do have this times on another
tab called Batch Times.
Product A could take 20 mins. and product B could take 42 mins. If I plan
to produce 15 batches of product A that should take 300 minutes or 5 hours. I
now plan to produce product B at 42 mins a batch. I want 6 batches. This
should take 252 mins. or 4.2 hours. This exceeds 510 minutes or 8.5 hours and
this is where I want to be flagged with the word FULL. If I didn't have
enough production set up I would want to be flagged with word PRODUCE. Is
this possible?
Example A
A1 A2
# of Batches
Product # 15
Product # 20
FULL
Example B
A1 A2
# of Batches
Product # A 10
Product # B 5
PRODUCE
Thanks