S
saintor1
Microsoft Access 97 and Outlook 2000/XP.
I have the code to create tasks (late binding) with no reference or
table linked to the exchange system and it is working OK.
How can I retrieve a list of tasks in order to create a report in the
same conditions? (no link / no reference).
Txs
I have the code to create tasks (late binding) with no reference or
table linked to the exchange system and it is working OK.
How can I retrieve a list of tasks in order to create a report in the
same conditions? (no link / no reference).
Txs