I have created an outline code with 2 levels. Level 1 contains of 3 different
categories of work, and under level 2 there is a number of detailed
categories (3-5 in each).
I now want to group my MS project plan under my 3 level 1 outline codes
(forecast, project and other is the names of them). However the MS project
plan shows a few lines under project, then a few lines under other, and then
some more categorized as project. - I would expect the MS project plan to
list ALL relevant tasks under each of the 3 individual outline code levels,
and not in smaller groups.
I beleive this to be a flaw in MS Project. I am using MS project 2007.
Any ideas of why it behaves like this ?
categories of work, and under level 2 there is a number of detailed
categories (3-5 in each).
I now want to group my MS project plan under my 3 level 1 outline codes
(forecast, project and other is the names of them). However the MS project
plan shows a few lines under project, then a few lines under other, and then
some more categorized as project. - I would expect the MS project plan to
list ALL relevant tasks under each of the 3 individual outline code levels,
and not in smaller groups.
I beleive this to be a flaw in MS Project. I am using MS project 2007.
Any ideas of why it behaves like this ?