J
jkap123
I'm trying to graph out three separate lines. i can get the "dots" to show up. the problem is getting the lines to show up.
1 2 3 4 5 6 7 8 9
x 6 7 8 7
y 7 8 9 7 8
z 6 8 5 6 7
the top row represents the day number (day 1, day 2, etc). can actually get a line to appear between two points, only when the values of those points are on consecutive days (for example, a line will appear between the 7 and 8 from the y group and between the 5 and 6 on the z group.) for the days that have not values (for example, day 2 for the z group,) i just leave the cell blank, because there was no data for that day.
could just manually draw a line between two lines, but that's kind of ridiculous to have to do that. not only that, but when i make the slightest change in the size of the graph, the manual line that i draw doesn't change with it. so it makes it really useless to do it that way.
it's amazing how these programs are so sophisticated and able to perform really complex tasks, but they can't do some of the most simple things!!
thanks for reading.
1 2 3 4 5 6 7 8 9
x 6 7 8 7
y 7 8 9 7 8
z 6 8 5 6 7
the top row represents the day number (day 1, day 2, etc). can actually get a line to appear between two points, only when the values of those points are on consecutive days (for example, a line will appear between the 7 and 8 from the y group and between the 5 and 6 on the z group.) for the days that have not values (for example, day 2 for the z group,) i just leave the cell blank, because there was no data for that day.
could just manually draw a line between two lines, but that's kind of ridiculous to have to do that. not only that, but when i make the slightest change in the size of the graph, the manual line that i draw doesn't change with it. so it makes it really useless to do it that way.
it's amazing how these programs are so sophisticated and able to perform really complex tasks, but they can't do some of the most simple things!!
thanks for reading.