Problem description in the format Gantt chart:
1/ If I choose as major time scale "years" and as minor
time scale "months", it is impossible to draw vertical
lines between months.
2/ If the task name is reformatted (for example bold or
italic), then the line does not break automatically
anymore and the text can not be fully seen anymore.
1/ If I choose as major time scale "years" and as minor
time scale "months", it is impossible to draw vertical
lines between months.
2/ If the task name is reformatted (for example bold or
italic), then the line does not break automatically
anymore and the text can not be fully seen anymore.