We have a custom application that does calendar scheduling. On most
machines we have MS Office 2000 but on the newer machines we installed
MS Office XP.
On our calendar app running under Access 2000 the calendar week starts
with Sunday and runs through Saturday. But on those systems we
installed Office XP on that changed to Monday through Sunday. This has
really caused us some big problems between views.
How can I change the Office XP version to look at the week as Sunday
through Saturday?
<Fran>
machines we have MS Office 2000 but on the newer machines we installed
MS Office XP.
On our calendar app running under Access 2000 the calendar week starts
with Sunday and runs through Saturday. But on those systems we
installed Office XP on that changed to Monday through Sunday. This has
really caused us some big problems between views.
How can I change the Office XP version to look at the week as Sunday
through Saturday?