G
GypsyWeaver
I want the Work Week calendar view to look like the 7 day week view so that I
can read it. How do I change it? (Outlook 2002).
Thanks,
Gypsy
can read it. How do I change it? (Outlook 2002).
Thanks,
Gypsy