R
Roger
I am trying to build a Word Merge and I am pulling in a date field. I want
this field to add 10 days to the date that it pulls in and show the true
date. How or what type of switch do I need to add.
Thanks
this field to add 10 days to the date that it pulls in and show the true
date. How or what type of switch do I need to add.
Thanks