G
Grant Reid
Hi
I hope someone can assist in getting my head around this problem.
On worksheet "Server 2 Database Space Summary" I have a QueryTable (lets
call this Q1) containing the following data
DB MB ALLOCATED MB USED MB
FREE % FREE DB CREATED
BIDemo data only 20 12
7 37.44 2004/04/21 09:30
BIDemo log only 20 0
19 99.75 2004/04/21 09:30
master data and log 6 4
1 23.14 2004/04/05 14:46
model data and log 2 1
0 40.42 2004/04/05 14:46
sybmgmtdb data only 45 10
34 76.71 2004/04/06 14:13
sybmgmtdb log only 5 0
4 99.57 2004/04/06 14:13
sybsystemdb data and log 2 1
0 35.05 2004/04/05 14:46
sybsystemprocs data and log 120 58
61 51.52 2004/04/05 14:47
tempdb data and log 3 1
1 59.17 2004/05/04 16:22
Q1 will be refreshed every day. As you can see the data represents data and
log usage for a particular data server, and the possibility exists that
databases may be added or deleted.
On worksheet "Server 2 Projection Seed Values" I have QueryTable (lets call
this Q2) containing the following data (a subset of Q2's data)
DB MB USED DB CREATED
BIDemo data only 12 2004/04/21
09:30
BIDemo log only 0
2004/04/21 09:30
Master data and log 4 2004/04/05
14:46
model data and log 1 2004/04/05
14:46
Sybmgmtdb data only 10 2004/04/06 14:13
Sybmgmtdb log only 0 2004/04/06 14:13
Sybsystemdb data and log 1 2004/04/05 14:46
Sybsystemprocs data and log 58 2004/04/05 14:47
Tempdb data and log 1 2004/05/04
16:22
Q2 will be populated only once and will be used as a baseline for making
database growth projections.
What I need to accomplish here is;
[a] If an entry exists in Q1 that does not exist in Q2, it must be added to
Q2
If an entry exists in Q2 that does not exist in Q1, it must be deleted
from Q2
Hope someone can help.
Kind Regards - Grant
I hope someone can assist in getting my head around this problem.
On worksheet "Server 2 Database Space Summary" I have a QueryTable (lets
call this Q1) containing the following data
DB MB ALLOCATED MB USED MB
FREE % FREE DB CREATED
BIDemo data only 20 12
7 37.44 2004/04/21 09:30
BIDemo log only 20 0
19 99.75 2004/04/21 09:30
master data and log 6 4
1 23.14 2004/04/05 14:46
model data and log 2 1
0 40.42 2004/04/05 14:46
sybmgmtdb data only 45 10
34 76.71 2004/04/06 14:13
sybmgmtdb log only 5 0
4 99.57 2004/04/06 14:13
sybsystemdb data and log 2 1
0 35.05 2004/04/05 14:46
sybsystemprocs data and log 120 58
61 51.52 2004/04/05 14:47
tempdb data and log 3 1
1 59.17 2004/05/04 16:22
Q1 will be refreshed every day. As you can see the data represents data and
log usage for a particular data server, and the possibility exists that
databases may be added or deleted.
On worksheet "Server 2 Projection Seed Values" I have QueryTable (lets call
this Q2) containing the following data (a subset of Q2's data)
DB MB USED DB CREATED
BIDemo data only 12 2004/04/21
09:30
BIDemo log only 0
2004/04/21 09:30
Master data and log 4 2004/04/05
14:46
model data and log 1 2004/04/05
14:46
Sybmgmtdb data only 10 2004/04/06 14:13
Sybmgmtdb log only 0 2004/04/06 14:13
Sybsystemdb data and log 1 2004/04/05 14:46
Sybsystemprocs data and log 58 2004/04/05 14:47
Tempdb data and log 1 2004/05/04
16:22
Q2 will be populated only once and will be used as a baseline for making
database growth projections.
What I need to accomplish here is;
[a] If an entry exists in Q1 that does not exist in Q2, it must be added to
Q2
If an entry exists in Q2 that does not exist in Q1, it must be deleted
from Q2
Hope someone can help.
Kind Regards - Grant