B
Basil Bonner
I need to chart the following: Variable output (Y-axis) vs. Required
Completion Time (X-axis).
Each column hsould represent a different person.
Currently I can only get Excel to plot one time on the X-axis for multiple
persons.
I am plotting from auto-filtered data and using MS Excel 2003 (11.8033.8028).
Completion Time (X-axis).
Each column hsould represent a different person.
Currently I can only get Excel to plot one time on the X-axis for multiple
persons.
I am plotting from auto-filtered data and using MS Excel 2003 (11.8033.8028).