L
Lavinia0077
Version: 2008
Operating System: Mac OS X 10.5 (Leopard)
Processor: Intel
Email Client: imap
Hi there,
I would like to have all the ToDos show up the way tasks do when I'm looking at a project. Strange that it doesn't seem to work this way....am I missing something?
Thanks!
L
Operating System: Mac OS X 10.5 (Leopard)
Processor: Intel
Email Client: imap
Hi there,
I would like to have all the ToDos show up the way tasks do when I'm looking at a project. Strange that it doesn't seem to work this way....am I missing something?
Thanks!
L