We are running Project Server 2007, SP1. The OLAP cube was originally
scheduled to be built every hour by employee Rick (in other hours,
every hour, an OLAP cube is built with Rick listed as the owner in the
PWA queue). This is running along fine, however, Rick is about the
leave the company. I have gone into PWA and built cubes myself, with
the same hourly refresh rate...however, once the next hour occurs, the
cubes are again being built with Rick as the owner. How do I remove
him as owner of the hourly cube builds?
Thanks!