G
Guest
I have designed an outlook contact form and am having a heckofatime getting
the form to recognize a future date.
Basically have two separate fields, both type date/time: Date of Injury &
Date to Complete Care
All I want to do is put in date of injury (i.e. 3/1/06) and have it
automatically calculate Date to Complete Care to one (1) year in the future.
So Date to Complete Care would be automatically 2/28/07.
I have tried the validate formula of ([DateofInjury] + 1Y) but it keeps
giving me today's date plus one (1) year. Even if I input 11/10/06 for the
date of injury I still get a Date to Complete Care of today's date + 1Y.
Having a tough time with this. Thanks for your help in advance.
the form to recognize a future date.
Basically have two separate fields, both type date/time: Date of Injury &
Date to Complete Care
All I want to do is put in date of injury (i.e. 3/1/06) and have it
automatically calculate Date to Complete Care to one (1) year in the future.
So Date to Complete Care would be automatically 2/28/07.
I have tried the validate formula of ([DateofInjury] + 1Y) but it keeps
giving me today's date plus one (1) year. Even if I input 11/10/06 for the
date of injury I still get a Date to Complete Care of today's date + 1Y.
Having a tough time with this. Thanks for your help in advance.