G
Girija
Hello ,
I am using MSP 2003. Suppose there are 50 resources assigned to various
projects.
How do I know :
1) resource allocation of each resource i.e which resource is allocated to
which task in a project and
2) if there is overloading for a resource and when the resource is
overloaded / overallocated
Requset you to update how the above information can be got through both, in
PWA and MSP.
Thanks in advance.
Girija
I am using MSP 2003. Suppose there are 50 resources assigned to various
projects.
How do I know :
1) resource allocation of each resource i.e which resource is allocated to
which task in a project and
2) if there is overloading for a resource and when the resource is
overloaded / overallocated
Requset you to update how the above information can be got through both, in
PWA and MSP.
Thanks in advance.
Girija