I'm using 2003 MSproject. I'm having trouble with the following:
a) tracking multiple resources time associated with mutiple tasks
b) in the report field I want the WBS code to print. In WBS field in
entered the project numbers, which need to show on the reports.
c) I have multiple project (same resources) how do I track each resource
time weekly, so at the end, I can generate a report.
THANK YOU
a) tracking multiple resources time associated with mutiple tasks
b) in the report field I want the WBS code to print. In WBS field in
entered the project numbers, which need to show on the reports.
c) I have multiple project (same resources) how do I track each resource
time weekly, so at the end, I can generate a report.
THANK YOU