Hi,
I'm trying to set up hyperlinks that reach specific slides accross other
powerpoint presentations. Right now I have been using this method:
Action Settings > Hyperlink to: > Other PowerPoint Presentation...
It then gives me the option to select a slide. I can either select by slide
number, or by slide name if I have already named the slide.
Now let's say I select "Slide 13" to link to. The problem with these
hyperlinks is that if I were to add or delete a slide in the middle of the
the "other powerpoint presentation" then the hyperlink no longer goes to the
proper slide. It continues to go to the "13th slide from the start" instead
of "what used to be the 13th slide". Even when I *name* each slide and
hyperlink to the slide name it still links to the "13th slide form the start."
This is in contrast to hyperlinking within a single powerpoint file. Those
hyperlnks will update if you add or delete slide so that you don't have to go
back and change every hyperlink again.
Is it possible to maintain this updating feature with hyperlinks accross
"other presentations"?
thanks,
art.
I'm trying to set up hyperlinks that reach specific slides accross other
powerpoint presentations. Right now I have been using this method:
Action Settings > Hyperlink to: > Other PowerPoint Presentation...
It then gives me the option to select a slide. I can either select by slide
number, or by slide name if I have already named the slide.
Now let's say I select "Slide 13" to link to. The problem with these
hyperlinks is that if I were to add or delete a slide in the middle of the
the "other powerpoint presentation" then the hyperlink no longer goes to the
proper slide. It continues to go to the "13th slide from the start" instead
of "what used to be the 13th slide". Even when I *name* each slide and
hyperlink to the slide name it still links to the "13th slide form the start."
This is in contrast to hyperlinking within a single powerpoint file. Those
hyperlnks will update if you add or delete slide so that you don't have to go
back and change every hyperlink again.
Is it possible to maintain this updating feature with hyperlinks accross
"other presentations"?