Hi
=SUM(A1:A10)
where A1 is the first cell in column A that you want included and A10 is the
last cell.
Change reference to suit.
You can also use
=SUM(A:A)
to include all cells within column A, but be sure not to have your cell with
the formula in column A or else you will get a circular reference