Stefan Nonneman
Dear all,
My three worksheets contain minimum info concerning the project.
Tasks sheet:
ID, Outline_Level, Outline_Number, Name,Predecessor, constraint_type,
constraint_date, Duration, Work, Actual_Duration, Remaining_Work, Notes.
Resource Sheet:
ID, Resource_names, Resource_Initials, Group, Type, Max Units, Std Rate,
Cost per use.
Assignment sheet:
ID, Resource ID, Resource_Initials, Units, Task_ID
Uploading in Project via a rather standard map results in a nice project
overview in which some tasks are empty. When I leave assignments away, the
result is much better.
Where can I find info about how info from the 3 sheets interact in MS
Project and which info is missing for correct uploading? Should I use
Resource ID or Resource Unique ID etc.?
Who has some experience with this type of problems?
Thanks in advance,
Stefan
My three worksheets contain minimum info concerning the project.
Tasks sheet:
ID, Outline_Level, Outline_Number, Name,Predecessor, constraint_type,
constraint_date, Duration, Work, Actual_Duration, Remaining_Work, Notes.
Resource Sheet:
ID, Resource_names, Resource_Initials, Group, Type, Max Units, Std Rate,
Cost per use.
Assignment sheet:
ID, Resource ID, Resource_Initials, Units, Task_ID
Uploading in Project via a rather standard map results in a nice project
overview in which some tasks are empty. When I leave assignments away, the
result is much better.
Where can I find info about how info from the 3 sheets interact in MS
Project and which info is missing for correct uploading? Should I use
Resource ID or Resource Unique ID etc.?
Who has some experience with this type of problems?
Thanks in advance,
Stefan