R
Rene
Hi,
im the administrator for a Project Server 2007 system and got a request for
setting up a customized list in Sharepoint with the possibility to link list
items to tasks in the project plan (like it is done for issues and risks). Is
that possible and if yes how could this be done?
Thanks, Rene
im the administrator for a Project Server 2007 system and got a request for
setting up a customized list in Sharepoint with the possibility to link list
items to tasks in the project plan (like it is done for issues and risks). Is
that possible and if yes how could this be done?
Thanks, Rene