install both verions of MSProject 2002 and 2003

S

sfong

Hi,

I am just wondering can I install both verions of MSProject 2002 and
2003 on a single machine and run it side by side without affecting each
other because I am developing an addin to support both.

Jonathan.
 
J

JulieD

Hi Jonathan

i've had no problem with both installed on my computer (used to have 4
versions installed) ... i just installed them into different
sub-directories.

Cheers
JulieD
 