A
Adrian
Hello,
I am wondering if anyone out there can provide some advice on the specific
steps (and things to watch out for) in configuring an EPM enviroment where
there is a clustered front end (running Project Server - 3 boxes, designed
for failover) connecting to a SQL Server 2000 backend cluster ?
I have looked through the configuration and installation guides and I'm
still not clear on the specific steps - can anyone help ? or at least tell
me what the high level steps migh tbe to ensure a successful configuration ?
Thanks.
Jeff
I am wondering if anyone out there can provide some advice on the specific
steps (and things to watch out for) in configuring an EPM enviroment where
there is a clustered front end (running Project Server - 3 boxes, designed
for failover) connecting to a SQL Server 2000 backend cluster ?
I have looked through the configuration and installation guides and I'm
still not clear on the specific steps - can anyone help ? or at least tell
me what the high level steps migh tbe to ensure a successful configuration ?
Thanks.
Jeff