L
Luca
Hi all,
How could I integrate project server tasks with Project Task list in share
point sites? I have PS 2007 (accessing with pwa) and MOSS 2007 (with Share
Point services 3) and I have correctly assigned a shre point site to the pwa
workspace.
thanks,
Luca
How could I integrate project server tasks with Project Task list in share
point sites? I have PS 2007 (accessing with pwa) and MOSS 2007 (with Share
Point services 3) and I have correctly assigned a shre point site to the pwa
workspace.
thanks,
Luca