J
Jacinda
I am looking to set up a schedule for my production team so that they can see
all of their open orders, what machine and or operator is working on them,
the material used, the qty needed for the order and the due date.
I really would like this to be a dynamic form where they can tweak dates or
move around the orders to move in a rush order or move back an order etc...
dates and times are changing all the time, and I'd like my production team to
have a screen to view each machine and the orders assigned to that machine.
In the past I have looked at the flex grid control (can't get it to work in
07 software- working on that issue). But I do think this may be something
that would work.
If the flex grid is what I need then -How does it work exactly?
If not - what would you suggest.
all of their open orders, what machine and or operator is working on them,
the material used, the qty needed for the order and the due date.
I really would like this to be a dynamic form where they can tweak dates or
move around the orders to move in a rush order or move back an order etc...
dates and times are changing all the time, and I'd like my production team to
have a screen to view each machine and the orders assigned to that machine.
In the past I have looked at the flex grid control (can't get it to work in
07 software- working on that issue). But I do think this may be something
that would work.
If the flex grid is what I need then -How does it work exactly?
If not - what would you suggest.