A
anovak
Any way to assign a % FTE (unit) at the project level without having
to enter it for each and every assignment?
This is assuming we don't want to setup less than 100% maximum
capacity in the enterprise resource pool.
Thanks,
Andy Novak
UNT
to enter it for each and every assignment?
This is assuming we don't want to setup less than 100% maximum
capacity in the enterprise resource pool.
Thanks,
Andy Novak
UNT